Project Need
International orders may include different drilling-rig categories, optional components, and supporting accessories. Before shipment, every machine must be checked against the order configuration so the customer receives the correct equipment and documentation.
ORANGE Solution
ORANGE organizes factory acceptance around a structured checklist. The team verifies machine model, main components, hydraulic and electrical functions, operating movements, accessories, spare parts, and shipping documents. Machines are arranged by project so that missing items can be identified before loading.
Why the Process Matters
Factory acceptance is the last opportunity to solve configuration questions before the equipment leaves the manufacturing site. It also gives the sales, engineering, production, and logistics teams a shared reference for the final delivery package.
Project Value
A disciplined acceptance process reduces avoidable delays after arrival. Customers receive a clearer equipment list, better-prepared documentation, and machines that have already undergone functional checks before international transportation begins.